Reconquista Aqueduct

  • Completion: 2021
  • Location: Santa Fe (Argentina)
  • Client: Ministry of Infrastructure and Transportation of Santa Fe

Construction of the drinking water supply system for the areas known as Zona Núcleo (which includes the towns of Reconquista and Avellaneda) and the area known as Ramal Oeste (which feeds towns and villages up to the town of Fortín Olmos), with pumping stations, cisterns and complementary works such as the supply of electric power, automation, remote management of the system and communication through fiber optics.

The construction of the works consists of a system of pressurized pipelines and potable water storage, starting at the New Reconquista Drinking Water Treatment Plant, which will supply eight towns and villages, installing more than 120 km of pipelines of different materials (HDPE and PVC), with variable diameters and pressures.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m