sanitation

Expansion of Wastewater Treatment Plant

  • Completion: 2014
  • Location: Hurlingham Buenos Aires (Argentina)
  • Client: AYSA

With more than 300,000 inhabitants benefited, this project is much more than a public service. It is an improvement in the quality of life of thousands of neighbors who, until now, did not have an efficient sewage system. 

The plant expansion involves the construction of a new medium-load activated sludge module with a nominal flow rate of 0.9 m³/s and, in the future, it is planned to further expand the plant with another similar module of 0.9 m³/s and a remodeling of the pre-existing plant.

The treatment included a loading chamber, de-silting, primary settling and a biological stage (aeration tanks and clarifiers).

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m