Mesopotamian Highway National Route No. 14

  • Completion: 2013
  • Location: Corrientes (Argentina)
  • Client: Dirección Nacional de Vialidad

The work includes the transformation of National Route Nº14 into a highway through the construction of the second roadway, an intersection distributor with Provincial Route Nº126, four turnouts, a junction with Provincial Route Nº144 and the access to the town of Parada Pucheta including main streets.

In addition to the existing bridges of the current roadway, a bridge over the Miriñay River and another one over the Ayuí-Grande Stream were also built. The bridge over the Miriñay River was of particular interest; with a span of 240 meters, founded with piles excavated in rock of one meter in diameter with some points of support on the fractured rock where cement was injected.

ROAD WORK OF THE YEAR 2013

2013 Argentine Road Association

30 km

length

1.539.126 m3

of embankments

20.004 ml

of metal fenders

365 ml

of bridges

Length of the highway:: 30.5 km
Asphaltic concrete road surface e=0.05m: 374.297 m2
Asphaltic concrete base e=0.07: 293.760 m2
Embankment: 1.539.126 m3
Asphaltic concrete base e=0.08m: 299.837 m2
Metal fenders: 20.004 m
Bridges 3:
On Miriñay river: 240 m
A° ayuí grande: 75 m
Exchanger rp nº 126: 50 m