Mesopotamian Highway National Route No. 14 (Entre Ríos)

  • Completion: 2012
  • Location: Entre Ríos (Argentina)
  • Client: Dirección Nacional de Vialidad

This project transformed National Route No. 14 into the Mesopotamian Highway, improving safety conditions for users and service, thus reducing transportation costs.

The work included the construction of new paved roadways and shoulders, adaptation of the drainage system, ten bridges over watercourses, railroads and road intersections at different levels, 12 km of paved collector roadways and 13 km of paved collector roadways on both sides of the highway, and the construction of four traffic returns.

ROAD WORK OF THE YEAR 2013

2013 Argentine Road Association

34 km

length

1.475.455 m3

of embankments

16.156 m3

concrete

1,066 ml

of bridges

Length: 34.80 km
Reinforced earth embankment: 17.232 m3
Selected soil sub-base: 102.047 m3
Granular stabilized base: 105.112 m3
1st asphalt base e=0,08m: 406.374 m2
Asphaltic road surface e=0.05 m: 579.443 m2
Metal fenders: 33.950 m
Embankment: 1.458.223 m3
Lime-treated subgrade: 379.934 m3
Soil-cement sub-base: 65.482 m3
Paved roads: 82.876 m3
2nd asphalt base e=0.09 m: 404.020 m2
Concrete bridges and culverts:: 16.156 m3
Bridges: 10
S/aº brazo yeruá: 59 m
S/aº yuquerí chico: 209 m
S/fc urquiza progressive 18+133: 44 m
S/aº yeruá: 79 m
Junction junction r.p. nº22: 50 m
S/aº yuquerí grande: 299 m
Junction. R.p. nº4: 50 m
S/fc urquiza progressive. 28+321.13: 47 m
Crossing junction international route a015: 50 m
S/aº ayuí grande: 179 m