National Highway Route No. 11

  • Completion: September 2023
  • Location: Tatané Formosa (Argentina)
  • Client: -

The work consists of doubling the roadway (asphalt pavement) of National Route 11 between kilometers 1,119.50 and 1,140.00 and is being carried out in a rural environment.

The route, in this section, crosses three important watercourses: Riacho Mbigua, Arroyo Lindo and Arroyo Saladillo, so new bridges have been designed in correspondence with the existing ones in the projected roadway.

In addition, the construction of four turnarounds is foreseen, in order to allow traffic access to local roads and private entrances located on the roadway in the opposite direction of traffic, or to change direction in the event of a possible error.

As complementary works, the construction of gravel collector roads, lighting at the return roads, bus docks and shelters for waiting buses, vertical and horizontal signaling, relocation of interferences, placement of vehicular defenses, transversal and longitudinal sewage system, various accesses, among others, are foreseen as complementary works.

20 km

in length

700.000 m3

of embankments

180,000 tn

asphalt

10.400 m3

concrete

Length: 20.5 km
Asphalt: 180,000 tn
Trace cleaning: 60 ha
Embankment with special compaction: 700.000 m3
Granular stabilized: 45.000 m3
Embankments: 700.000 m3
Reinforced concrete: 10.400 m3
Sanitation: 250.000 m3
Soil lime: 95.000 m3
Bridges: 3 ( Saladillo 14.3 m, lindo 17.7 m, Mbigua 17.5 m)