Pioneers Pluvial Conduit

  • Completion: 2024
  • Location: Formosa (Argentina)
  • Client: Central Program Management Unit (U.C.A.P.)

The Los Pioneros canal collects an important basin (440 hectares), and receives contributions from two different sectors. On the one hand, from the north and northwest, an area in an advanced state of current urban development, and, from the south and southwest, through a series of canals located in the wetlands area, which slowly cross Alicia Moreau de Justo Avenue and reach the current "Los Pioneros" canal along 16 de Julio Street.

In this first stage, the construction of the main collector along Los Pioneros Street is proposed, in order to organize runoff in this area of incipient urban development and minimize the risk of rainwater flooding.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m