Construction of the Las Palmas Port Cargo Terminal

  • Completion: January/2023
  • Client:
  • Location: Las Palmas Chaco (Argentina)

The purpose of this project is to strengthen the logistics infrastructure of the province of Chaco, enhance the development of the provincial logistics system, promote regional integration, bulk and container transportation through the Paraná-Paraguay waterway. 

Its strategic purpose is to position regional products in international markets, offering predictability, service security and reducing logistics costs as a competitive advantage.offering predictability, service security and reducing logistics costs as a competitive advantage.

The project includes a 201-meter dock, a 300-container storage yard, a covered storage warehouse and a 75-ton container crane.

It also has a customs area, narcotics detection lanes, a storage area and 15 administrative offices.

This port will have a multiplier effect on employment and will allow for profitability and global competition in all commercial transactions.

277 m3

of embankments

1.725 m3

reinforced concrete

520 m

in length

Awesome Image
Length: 0.52 km
Soil movement and resistant structure (building Nº2,2,3,4, access portico - sentry boxes 42 and 43, tank tower): 1 gl
masonry - walls - mamp. fundac. lad. com. 40,96 m3
Masonry - walls - lintel (2 fe 8mm, concrete): 708.00 ml
Plaster - waterproof plastering on wall: 2.083,26 m2
Wall tile - polished porcelain tile 35×35: 130,80 m2
Polished porcelain baseboard: 502,40 m
Carpentries - carpentries aluminum frames (Modena) anodized with glass: 566,87 m2
Controlled density fill base (R.D.C.): 8623.94 m2
Slope revetment: 1384.33 m2
Preparatory works (initial site cleaning, periodic site cleaning, final site cleaning, site leveling and site stakeout): 2588.28 m2
Road work (pavement Hº - between building 1 and 2 - H=45 cm - building Nº 4): 256.50 m2Masonry - walls - reinforcements ( 2 Fe 6mm, concrete): 354.00 ml
Masonry - insulation - horizontal and vertical smoothing layer wall: 409,64 m2
Subfloors - Hº caste Hº s/slab (thickness: 5 cm) 88,63 m2
Floors and baseboards - smoothed/rolled cement finish: 776,00 m2
Ceilings - suspended - PVC in strips: 650,00 m2
Paintings - latex on interior walls: 1,870.85 m2
Simple concrete roadway H-35: 8623.94 m2