Opening of river arm through dredging: 586,933 m3
Embankment with free refluent: 641,492 m3
Flexible asphalt: 40,000 m2
Urban solid waste treatment plant: 30 hectares
Embankment with refluent content: 517,537 m3
Compacted selected soil embankment: 231,188 m3
Lined rainwater channels: 20,000 m