sanitation

Storm drains

  • Completion: January 2019
  • Location: Bella Vista Corrientes (Argentina)
  • Client: Ministry of Treasury and Finance. Province of Corrientes.

The city of Bella Vista is located 143 km from the capital city traveling along National Route No. 12. It is the head of the department of the same name, which is located in the western area of the province of Corrientes. 

The project aims to alleviate urban flooding, and comprises an integral project covering 700 hectares and benefiting the entire population of approximately 35,000 inhabitants. For this purpose, a new network of HDPE drainage pipes of different diameters will be built, connecting them to a backbone network of H°A° tunnels and leading to dissipation works (gabions) and then to the Paraná River.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m