Preloader Close
energy

Engineering, supply of equipment and materials and construction of the Northeastern Argentine Gas Pipeline.

  • Completion: October 2023
  • Location: Ibarretá Formosa (Argentina)
  • Client: Energía Argentina S.A.

This is a trunk gas pipeline made of carbon steel pipe that extends along a length of approximately 90 km in the Province of Formosa.

The completion of the Argentine Northeast Gas Pipeline (GNEA) will enable the provinces of Formosa, Corrientes, Chaco and Misiones to be included in the natural gas supply, and to supply this essential energy source with production from the Vaca Muerta oil field. Once the home networks are completed, it will provide gas supply to 3,400,000 people.

At the same time, will make the entire production of the region competitive, settling a historical debt for this part of the country and changing the energy matrix of the electro-dependent provinces, byThis will settle a historical debt for this part of the country and change the energy matrix of the electro-dependent provinces by making it possible to take advantage of natural gas. making it possible to take advantage of natural gas..

90 Km

in length

Awesome Image
  • Technical data
Opening and leveling: 88703 Mts.
Trenching: 88703 Mts
Assembly of line block valves: 2 U
Hydraulic test: 88703 Mts
Topography: 88703 Mts
Pipe parade: 88703 Mts
Lowering and capping: 88703 Mts
Drying: 88703 Mts
Go To Top