Length: 128.60 km
Concrete: 7,664 m3
Towers: 678
Topographic survey: 128.60 km
Excavations and foundations: 678
Embankments: 160,000 m3
Reinforced concrete: 110 m3
Electrical conductors: 1,028.8 km
Roads and access to pickets: 128.6 km
Laying of conductors: 128.60 km Double stranding