Length: 1100 mts
Reinforced concrete: 15,890 m3
Sheet piling: 3.132,50 m2
Shoreline protection with furrowing: 14,291.20 m3
Precast fabrication: 2,450 m3
In-situ concrete pouring: 4,500 m3
Embankments: 33,700 m3
Soil movement: 118,200 m3
Backfill with reflux: 27.317,50 m3
Pilotage diameter 0.7 and 0.8 m: 4,300 ml
Pre-molded assembly: 1,799 pcs.
Soil excavation with machines: 386,012 m3