Preloader Close
hydraulics

Puerto Ituzaingó Pier

  • Completion: March 2024
  • Location: Ituzaingó Corrientes (Argentina)
  • Client: S.U.E.P Sub Unidad Ejecutora de proyecto- Province of Corrientes

The construction of the dock of the new Port of Ituzaingó would be the only port in the province on the Upper Paraná River. the only port in the province on the Upper Paraná River. and, added to the Industrial Park, it would not only give the producers of the region the possibility of commercializing by river, but also to give added value to the products of the area in the Industrial Park.

Another advantage is the possibility of linking this project with railroad lines such as the Urquiza lines such as those of the Urquiza train and will have a multipurpose multipurpose dock with loading yards, a 2,000 square meter warehouse, auxiliaryIt will also have a 2,000 square meter warehouse, auxiliary facilities and cargo reception facilities.

It is a transparent pier on piles closed at the back by sheet piling. In this way it is presented as a continuation of the esplanade that is executed on land after filling and leveling the ground.

300 mt

spring-loaded

33.700 m3

of embankments

8.700 m3

reinforced concrete

Awesome Image
Length: 1100 mts
Reinforced concrete: 15,890 m3
Sheet piling: 3.132,50 m2
Shoreline protection with furrowing: 14,291.20 m3
Precast fabrication: 2,450 m3
In-situ concrete pouring: 4,500 m3
Embankments: 33,700 m3
Soil movement: 118,200 m3
Backfill with reflux: 27.317,50 m3
Pilotage diameter 0.7 and 0.8 m: 4,300 ml
Pre-molded assembly: 1,799 pcs.
Soil excavation with machines: 386,012 m3
Go To Top