Length: 1100 mts
Reinforced concrete: 15.890 m3
Sheet piling: 3.132,50 m2
Shore protection with reinforced concrete: 14.291,20 m3
Precast manufacturing: 2,450 m3
In-situ concrete: 4,500 m3
Embankments: 33,700 m3
Soil movement: 118,200 m3
Backfilling with refluent: 27,317.50 m3
Piling diameter 0.7 and 0.8 m: 4,300 ml
Precast assembly: 1,799 units
Soil excavation with machines: 386,012 m3