Works for the EBY 340 International Nexus - Santa Ana - Loreto Section

  • Completion: 2020
  • Client: Yaciretá Binational Entity
  • Location: Santa Ana / Loreto Misiones (Argentina)

We carried out the transformation of National Route 12, working on a 4-lane highway (road duplication), between Santa Ana and access to Loreto.

It should be noted that this section of highway gives continuity to the sectors already enabled from the Garita road node. This transformed National Route 12 into a modern and safe roadway with four lanes, New Jersey type concrete separators, pedestrian bridges and lighting systems.

This work involved different tasks:

* Construction of embankments, asphalt, concrete, paving and New Jersey type guardrails.
* Storm drains, viaducts and lighting systems.
* High and low level crosswalks.
* Relocation of interferences for power lines, provision and subway laying of medium voltage and provision and pre-assembled overhead laying of medium voltage.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m