Basic work and paving of the access to the town of Tobuna.

  • Completion: April 2023
  • Location: Tobuna Misiones (Argentina)
  • Client: DPV (Provincial Directorate of Roads) Misiones

Tobuna is located in the Department of San Pedro, in the northwest of the Province of Misiones, 36 kilometers north of the city of San Pedro, on which it depends administratively.

The project consists of a rural and an urban section. The first includes the execution of basic works, ditch profiling, construction of lined ditches in areas with significant slopes, transversal culverts, longitudinal culverts, paving of the 6.30 m wide roadway, construction of 1.50 m wide paved shoulders on both sides, provision and placement of metal fenders, and horizontal and vertical signaling.

In the urban area, basic works are expected to be carried out, including the construction of an 8.30 m wide paved roadway, 1.00 m curbs, 1.50 m sidewalks, speed bumps, drains, transversal culverts, and horizontal and vertical signaling.

2 Km

in length

12.040 M3

of embankments

2,300 TN

asphalt

12.470 M2

asphalt used

Provision and installation of type I3 construction site sign: 2.00 pc
Excavation not classified as a deposit: 5.676,62 m2
Embankment with special compaction: 12.040,58 m3
Concrete h-8: 18,33 m3
Concrete h-21: 241,24 m3
Construction of speed bumps: 250,03 m2
Provision and installation of ø0.80m hºaº pipe.: 36,20 m
Provision and installation of ø1.20m pipe hºaº.: 34,80 m
Thermoplastic horizontal signage by extrusion: 94,80 m2
Execution of granular stabilized base with soil: 2.011,49 m3
Execution of league irrigation: 12.574,96 m2
Execution of soil shoulder e=0.15m: 464,08 m3
Clearing, dethroning and land clearing: 2.64 ha
Excavation for foundations: 576,64 m2
Construction of a 1.00m curb and gutter.: 666,75 m
Concrete h-13: 404,39 m3
Provision and placement of special steel for concrete adn 420: 19.86 tn
Supply and installation of metal gratings for drains.: 5,60 m2
Provision and installation of ø1.00m pipe hºaº.: 45,60 m
Thermoplastic horizontal spray-on signage: 784,83 m2
Vertical signage: 37,82 m2
Execution of priming irrigation: 12.997,66 m2
Execution of asphalt concrete pavement e=0.07m: 12.470,41 m2
Provision and installation of metallic vehicular bumper: 210,97 m