Basic Works and Paving of Provincial Route No. 23

  • Location: Palo Santo Formosa (Argentina)
  • Client: Dirección Provincial de Vialidad

The executive project of Provincial Route No. 23 is located between the intersections with National Routes No. 81 and No. 86, with a length of 77.56 km in the province of Formosa, with the purpose of improving road safety by optimizing the geometry and guaranteeing trafficability 365 days a year, tending to a better regional integration.

78 km

in length

835 m3

of embankments

127 Tn

asphalt

1.180.033 M2

asphalt used

Embankment with special compaction: 834.917,98 m3
Embankment reconstruction: 204.893,05 m3
Common excavation for sanitation (with soil reinstatement): 65000 m3
Covering of slopes and banks with 0.10 m thick grass soil.: 108.748,80 m3
Stone concrete class h- 13: 1.186,95 m3
Concrete class h- 4: 129,47 m3
Embankment without special compaction: 21.700 m3
Excavation not classified as a deposit: 274.424,93 m3
Topsoil for covering islands and flowerbeds: 98,70 m3
Reinforced stone concrete class h-21, excluding reinforcement: 1.049,97 m3
Concrete class h- 8: 127,14 m3
Excavation for foundations: 1.270,13 m3
Bridges: 6 
Pilagas: 60 m
Yalop: 60 m
Montelindo Grande: 80 m
Tatu Piré: 100 m
Montelindo Chico: 60 m
Cha Gaday: 60 m