Preloader Close
water

Optimization of Drinking Water Supply and Distribution System

  • Completion: 2022
  • Location: Clorinda Formosa (Argentina)
  • Client: Ministry of Planning, Investment, Public Works and Services of Formosa. UCAP.

The project consisted of the execution of different works:

- New raw water intake

- Viaducts and aqueducts

- New water treatment plant

- Treated water aqueduct

- Distribution systems

The increase in drinking water production due to the construction of a new water treatment plant and intake works, together with the configuration of new distribution centers, guarantee the efficient and continuous supply of water to the city of Clorinda, Formosa.

 

This project covers the demand required for the current and projected population over a period of 20 years, so that the design horizon of the project is foreseen until 2037, with a benefited population of 64,900 inhabitants.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m