Construction of Basic Works, Drains, Bridge over Arroyo Tunas Stream and Paving of Provincial Route No. 2

  • Completion: July 2023
  • Location: Azara-Aposteles Misiones (Argentina)
  • Client: DPV

288.085 m3

of embankments

19,116 tn

asphalt

1.269 m3

reinforced concrete

105.018 m2

of asphalt used

Length: 13,850 km
Clearing, dethroning and land clearing: 56.37 ha
Construction of transverse culverts: 863 ml
Execution of granular stabilized base: 15.101 m3
Execution of bonding irrigation and priming irrigation.: 293.451 m2
Construction of rough gravel curbs: 9.701.53 m3
Construction of base of seat, curbs and gutters in urban areas.: 4,629 ml
Construction and replacement of wire fences: 24,672 ml
Soil movement (embankment): 288.085 m3
Execution of granular sub-base: 22.369 m3
Execution of asphalt base: 96.755 m2
Execution of asphalt layer: 105.018 m2
Vertical and horizontal signage: 7.468.78 m2
Bridges: 1 (arroyo tunas bridge 102 m)