Refunctionalization of the Land Accesses to the Port of Barranqueras

  • Completion: May 2022
  • Location: Barranqueras Chaco (Argentina)
  • Client: Directorate of Provincial Roads Chaco

10 km

in length

64.716 m3

of embankments

11,782 tn

asphalt

19.850 m3

reinforced concrete

Common excavation: 30605,84 m3
Demolition of flexible pavement: 2772,73 m2
Construction of mdc sub-base: 8191,02 m3
Asphalt concrete pavement: 2772,73 m2
Stone concrete h-13 - ex class "d".: 465 m3
Vertical grate drains (type s4): 2 un
Reinforced earth drains: 3 un
Zinc-plated metal railing: 2438,05 m
Removal of single galvanized metal railing: 4874 m
Horizontal marking by hot spraying: 3354,26 m2
Vertical signage: 300 m2
Sealing of cracks and joints in existing pavement.: 6,94 m3
Irrigation: 60759,82 m2
Panel ii - Maipu and Gaboto Avenue traffic circle: 1 gl
Demolition of rigid pavement: 9803,96 m2
Embankments with special compaction including supply and transportation: 58928,92 m3
Concrete pavement: 4085,54 m2
Construction of concrete roadway: 50219,57 m2
Horizontal grate drains: 2 un
0,80m p.e.a.d. pipe conduit: 102 m
End drains s/pl dnv j-6710-i: 9 un
Reinforced zinc-plated metal railing (double): 2138,77 m
Olympic perimeter fabric: 870 m
Horizontal extrusion marking 3mm: 267,36 m2
Crack sealing with fine asphalt mixture: 30 m
In 0.06 m thickness: 26717,09 m2
Board i - maipu avenue: 1 gl
Board iii - gaboto avenue and san bernardo avenue: 1 gl