Preloader Close
Vials

Resurfacing and repairing of Provincial Route No. 71

  • Completion: -
  • Location: Corrientes (Argentina)
  • Client: -

Doubling of the roadway and construction of collector roads on National Route No. 12, between Empedrado and Itatí (km 1023.00/ km 1036.00) in the province of Corrientes. It includes tasks such as the execution of measurements, pedestrian walkways, shelters, sealing of cracks and potholes, moving of monument, removal and placement of wire fences, gantries, single and double davits.

4,552 ml

ductwork

437.723 m3

of soil movement

65.546 m3

concrete

173.593 m3

of excavations

Duct length: 4,252.00 ml
Concrete for roadway: 65.546,09 m3
Duct sections: 3m x 1,75m; 2,5m x 1,75m; 2m x 1,75m; 1,5m x 1,5m; 2,5m x 1,5m; 3m x 1,5m
Excavations: 173.593,20 m3
Granular stabilized: 107.657,63 m3
Lighting columns and fixtures: 671 ml
Vertical and horizontal signage: 4504,30 m2
New jersey and metallic defense: 46,913.20 ml
Soil movements: 437.723,45 m3
Asphalt concrete: 82,492.61 tn
Iron for ducts and sewers: 860 tn
Coated gutters: 5.884,00 ml
Various laces. 36.252,50 ml
Awesome Image
Go To Top