National Route N° 14

  • Completion: 2021
  • Location: Cruce Caballero, Loc S. Pedro Misiones (Argentina)
  • Client: Dirección Nacional de Vialidad

The work consists of the execution of new works (basic works + structural package with asphalt pavement, roadway 1+1) on National Route No. 14 between kilometers 1056.7 (Provincial Route No. 20 junction) and 1091.32 (Piñalito Sur).

The structural package of the roadway consists of a 7.30 m wide and 0.05 m thick asphalt concrete wearing course, a 7.44 m wide and 0.07 m thick asphalt concrete base, a 7.84 m wide and 0.15 m thick granular stabilized base with lime improved soil, and a 8.24 m wide and 0.15 m thick granular stabilized subbase (from progressive 0+00 to 26+300).

This work also includes the new route of National Route N° 14 in the section passing through the town of Cruce Caballero, San Pedro. Province of Misiones. The considered subsection starts in the vicinity of Km. 1,067 of the National Route, ending in the vicinity of Km. 1,070.50.

ROAD WORK OF THE YEAR 2013

2013 Argentine Road Association

34 km

length

1.711.626 m3

of embankments

87,255 tn

asphalt

1,363 tn

reinforced concrete

  • Length: 34.634 km
  • Embankments 1.711.626,11
  • Asphalt used 87,225.25 tn
  • Reinforced concrete 1.363,87 m3
  • Asphalt applied 569.225,08 m2
  • Unburdening and dethroning 206.01 ha
  • Excavations 891.311,95 m3
  • Stabilized base 80.095,32 m3
  • Cross culverts 2,168.38 ml
  • Metal railings 18.835,22 ml
  • Horizontal signage 21.141,15 m2
Construction of wire fence 70,391.8 ml
  • Some 8,500 tons of asphalt concrete were placed on the bypass.
  • The total amount of the work was 78,800 tons.
  • 2,500,000 m3 of soil and rock were moved.
  • A total of 2,600 linear meters of sewer pipes were laid.
  • A total of 426,200 kg of explosives were used to open the trace.