Provincial Route N° 221

  • Completion: 2018
  • Location: Misiones (Argentina)
  • Client: UEP-UCP and PFE

Located in the central and Alto Uruguay region of Misiones, the work contemplates the cleaning of the route, soil movements, rock blasting, compaction, construction of embankments, culverts and paving.

It is a strategic work for the region since it generated a link between the Alicia Baja port, on the Uruguay River and the junction with Provincial Route Nº 13, improving the conditions of this important productive region.

PROVINCIAL ROAD WORKS 2017

54 km

length

1.950.000 m3

of embankments

1.000 m3

concrete

604 ml

of bridges

Length: 54 km
Rough soil sub-base: 62.260,71 m3
Asphalt concrete base: 372.697 m2
Concrete for sewers: 1.000 m3
Embankments with special compaction: 1.950.000 m3.
Granular base treated with lime: 60.564 m3
Asphaltic concrete road surface. 365.157 m2