Provincial Route N° 86

  • Completion: 2011
  • Location: Formosa (Argentina)
  • Client: -

This project transformed National Route No. 14 into the Mesopotamian Highway, improving safety conditions for users and service, thus reducing transportation costs.

The work included the construction of new paved roadways and shoulders, adaptation of the drainage system, ten bridges over watercourses, railroads and road intersections at different levels, 12 km of paved collector roadways and 13 km of paved collector roadways on both sides of the highway, and the construction of four traffic returns.

ROAD WORK OF THE YEAR 2013

2013 Argentine Road Association

120 km

length

4,603,643 m3

of embankments

12,014 m3

concrete

439,666 m3

of sanitation

Length : 120.47 km
Sanitation : 439,666.83 m3
Subgrade treated with lime e=0.20m : 207,518.74 m3.
Granular stabilized e= 0.12m : 118,006.09 m3
Embankments : 4,603,643.07 m3
Concrete sewers : 12,014.03 m3
Subgrade lime soil e= 0.20m : 205,848.21 m3
Asphalt layer e=0.05m : 950,818.26 m2