Provincial Route N° 9 - Formosa

  • Completion: 2011
  • Location: Formosa (Argentina)
  • Client: DPV Formosa and UCFE

Provincial Route No. 9 is located in a flat area with agricultural and livestock farms and crosses the province from east to west.

It also serves the economic activities that have grown the most in the province of Formosa (agriculture and livestock). In the Colonia Cano-El Colorado section, the main activity is agriculture, especially rice, where the area planted has increased and is expected to continue its exponential growth in the coming years.

The incorporation of the structural package along the entire length of the work, together with adjustments to the computation of the longitudinal runoff and its lateral culverts, is what gives rise to the present modification of the work.

In the present modification, the construction of flexible pavement along the entire route is contemplated. Likewise, the calculations regarding the longitudinal runoff of the work are adjusted with the incorporation of 18 lateral culverts type H-1900 Bis.

The works were completed with the execution of specially compacted shoulders, with the provision of soil from borrowed materials and with horizontal and vertical signaling for traffic safety purposes.

ROAD WORK OF THE YEAR 2013

2013 Argentine Road Association

63 km

length

2.762.769 m3

of embankments

15.011 m3

concrete

21,900 ml

of metal railings

  • LENGTH
    63.2 Km
    TERRAPLENES
    2,762,769 m3
    EXCAVATION FOR SANITATION
    245,804 m3
    SEWER CONCRETE
    13,752 m3
    BRIDGE CONCRETE
    1,259 m3
    Lime-treated sub-surface
    122,127 m3.

  • CAL CAL CALENDAR SOIL SUB BASE
    124,055 m3
    GRANULAR STABILIZED BASE
    86,925 m3
    ASPHALTIC CONCRETE CARPET
    520,948 m2
    METALLIC RAILINGS
    21,900 m