Preloader Close
sanitation

Sanitation of the Morón Creek Watershed

  • Completion: -
  • Location: Morón, Buenos Aires (Argentina)
  • Client: DI.P.O.H- Buenos Aires

The purpose of this project is to solve the flooding problems caused by a significant concentration of excess water in the Castelar and Morón Centro areas, fully urbanized sectors located in the middle basin of the Morón River.

This will prevent flooding and benefit more than 20,000 residents. This development transformed this sector of the city, which often suffered from flooding, and made it possible to continue with social, cultural, sports, and economic activities without any inconvenience.

The construction of the work is completed with drains for paved streets, inspection chambers for rectangular conduits, junction chambers, reconstruction of pavements, resolution of interferences, among others.

7.534m

in length

332.602 m3

of embankments

94,479 tn

asphalt

4.579 m3

concrete

Awesome Image
  • Technical data
  • More data
Length: 7.534,00 m
Asphalt 94,479.71 Tn
Reinforced concrete (miscellaneous): 2,771.30 m3
Paving (base and binder): 480,444.18 m2
Pluvial drainage (pipes): 1,071.59 m
Crosswalks, high level and low level: 3 u
Relocation of interferences for 13.2KV electrical line duct: 866.02 m
Relocation of interferences, provision and pre-assembled overhead laying of 13.2KV or 33KV medium voltage: 1,908.48 m
TERRAPLENES: 332.602,57 m3
ASPHALT: 480,444.18 m2
REINFORCED CONCRETE (VIADUCT): 1,808.58 m3
NEW JERSEY TYPE RAILINGS: 7.534,00 m
VIADUCTS (LONG. 32M): 2 u
LIGHTING - SUPPLY AND PLACEMENT OF 90 MM. PIPES: 4,841.06 M3 4.841,06 m
RELOCATION OF INTERFERENCES-PROVISION AND UNDERGROUND CONSTRUCTION OF MEDIUM VOLTAGE 33 KV: 557.27 m