hydraulics South Waterfront Defense Completion: 2003 Location: Gualeguay Entre Ríos (Argentina) Client: SUPCE- Entre Ríos The work is located in the city of Gualeguay, Entre Ríos. This area had a constant flooding problem due to its proximity to the Gualeguay River, which has a flow rate of approximately 210 m3/s. To mitigate this problem, the Gualeguay River was constructed. In order to mitigate this problem, it was [...]
Hydraulic Regulation of the Mar Chiquita Lagoon Completion: 2003 Location: Junín Buenos Aires (Argentina) Client: Undersecretary of Water Resources The work consists of a homogeneous embankment of loose materials that extends on both sides of the control work located at the source of the North Channel. The design of the embankment includes protection of the [...]