Energy Fueguino Gas Pipeline - Lines 2 and 3. Tierra del Fuego. Completion: 2017 Location: Lago Escondido, Río Grande. Tierra del Fuego (Argentina) Client: Province of Tierra del Fuego, Antarctica and South Atlantic Islands The project will allow increasing the current gas transportation capacity and bringing the service by network to neighborhoods of Río Grande [...]
energy Powering in the Patagonian Cordilleran System Completion: 2018 Location: San Carlos de Bariloche Neuquén (Argentina) Client: Municipality of San Carlos de Bariloche Expansion and improvement of the gas supply network comprising 14,000 meters of Loop gas pipeline to Pilcaniyeu in 12" and 7,000 meters of Loop Ramal Bariloche in 12". The extension [...]
energy High Voltage Line 132 Kv Completion: - Location: Itá Ibaté / Paso de la Patria Corrientes (Argentina) Client: Secretaría de Energía de Corrientes The work consists of a 132 KV double-terminal high voltage line that interconnects the ET PIRAYÚ transformer station in the locality of Paso de la Patria with [...]
Engineering, supply of equipment and materials and construction of the Northeastern Argentinean Gas Pipeline. Completion: October 2023 Location: Ibarretá Formosa (Argentina) Client: Energía Argentina S.A. This is a trunk gas pipeline made of carbon steel pipe that extends along an approximate length of 90 km in the Province of Formosa (Argentina).
Gas pipeline ERP Curuzú Cuatia - ERP Mercedes. Corrientes Completion: 2019 Location: Mercedes Corrientes (Argentina) Client: Secretariat of Energy of Corrientes This work consists of the provision of materials and the construction of a gas pipeline that will start from the Primary Regulation Station (ERP) of Curuzú Cuatiá and will end at a scraper receiving trap [...]