sanitation Sewage drainage system Completion: - Location: Pirané Formosa (Argentina) Client: ENOHSA The sewage system involves the entire town of Pirané, approximately 820 blocks of sewage infrastructure. It includes the laying of PVC pipes for drains of various diameters, pumping stations for the material, more than 5 km of sewage pipes, and the installation of [...]
Expansion of the Drinking Water Distribution System S.O. Zone Completion: December 2023 Location: S.O. Zone - City of Formosa Client: Unidad Central de Adminstración de programas (U.C.A.P) The drinking water supplied to the inhabitants of the city of Formosa and its metropolitan area, comes from two drinking water treatment plants, one located in the [...]
sanitation Los Pioneros Rainwater Pipeline Completion: 2024 Location: Formosa (Argentina) Contractor: Unidad Central de Adminstración de programas (U.C.A.P) The Los Pioneros canal collects an important basin (440 hectares), and receives contributions from two differentiated sectors. On the one hand, from the north and northwest, an area in an advanced state of current urban development, and, on the other hand, from [...]
Water Drinking water production, transportation and distribution system. Completion: July/2025 Location: Concordia Entre Ríos (Argentina) Client: ENOHSA The present project aims to supply drinking water to the entire city of Concordia, for a design period of 20 years, from 2020 to 2040. The city of Concordia presented, [....]